{"id":214,"date":"2014-10-29T13:58:40","date_gmt":"2014-10-29T11:58:40","guid":{"rendered":"http:\/\/www.mme-engineering.at\/?page_id=214"},"modified":"2014-11-20T10:15:51","modified_gmt":"2014-11-20T08:15:51","slug":"extracting-elemental-metals-from-urban-repositories","status":"publish","type":"page","link":"https:\/\/www.mme-engineering.at\/en\/hydrometallurgyurban-mining\/extracting-elemental-metals-from-urban-repositories\/","title":{"rendered":"Extracting elemental metals from urban repositories"},"content":{"rendered":"<h1>Extracting elemental metals from urban repositories<\/h1>\n<p>The overarching term \u201cUrban Mining\u201d is used in the professional world and stands for increasing readiness also in the field of assuring a supply of raw materials to describe concepts for developing ways to extract valuable materials from existing waste storage facilities in order to feed these back into the production industry. MME Engineering\u2019s approach to this topic lies in hydrometallurgical concepts. Old repositories which in some cases store several different metals, are transitioned to the hydrous phase by means of chemical decomposition.\u00a0 By means of steps of separation, one can extract elemental metals.<\/p>\n<p>&nbsp;<\/p>\n<a href=\"\/en\/hydrometallurgyurban-mining\" title=\"Back to Hydrometallurgy\/Urban Mining\" class=\"btn btn-default btn-small btn-shortcode\" target=\"_self\"><i class=\"icon-fa fa-arrow-circle-left\"><\/i> Back to Hydrometallurgy\/Urban Mining<\/a>\n","protected":false},"excerpt":{"rendered":"<p>Extracting elemental metals from urban repositories The overarching term \u201cUrban Mining\u201d is used in the professional world and stands for increasing readiness also in the field of assuring a supply of raw materials to describe concepts for developing ways to extract valuable materials from existing waste storage facilities in order to feed these back into [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":104,"menu_order":4,"comment_status":"closed","ping_status":"closed","template":"template_builder.php","meta":{"footnotes":""},"class_list":["post-214","page","type-page","status-publish","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.mme-engineering.at\/en\/wp-json\/wp\/v2\/pages\/214","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mme-engineering.at\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mme-engineering.at\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mme-engineering.at\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mme-engineering.at\/en\/wp-json\/wp\/v2\/comments?post=214"}],"version-history":[{"count":5,"href":"https:\/\/www.mme-engineering.at\/en\/wp-json\/wp\/v2\/pages\/214\/revisions"}],"predecessor-version":[{"id":597,"href":"https:\/\/www.mme-engineering.at\/en\/wp-json\/wp\/v2\/pages\/214\/revisions\/597"}],"up":[{"embeddable":true,"href":"https:\/\/www.mme-engineering.at\/en\/wp-json\/wp\/v2\/pages\/104"}],"wp:attachment":[{"href":"https:\/\/www.mme-engineering.at\/en\/wp-json\/wp\/v2\/media?parent=214"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}